Waterpump rebuilt and installed. Clutch cover installed temporarily. Awaiting new clutch basket:
The start of a leak down test:
Kickstand was a rusty mess: Cleaned it up on the wire wheel and coated with clearcoat. Wasn't quite what to do to prevent it from rusting again. And not sure how it is treated at the factory to prevent rust?:
Cans blasted, powder-coated, and repacked:
Never been a fan of pop-rivets but am very much liking this rivnut tool. It secures well and draws the two pieces of sheet metal together:
Pipes blasted and coated with barbecue paint. Should have decoked them first. Next time i guess:
_________________
MC21R9N track
MC18R2J track
CBR954
CR250

