Update.
Got the oil pump & reservoirs installed this afternoon with new hoses throughout. Replaced all the carb hoses too. Fitted new RC valve cables. Fitted new bolts on the discs and lower forks as the old ones were a bit shabby. Fitted the repaired PGM (thanks 2Trace) but haven't started it yet...will leave that til next week.
Also the bodywork will be back on Thursday. Its been in with the body shop for a week so went along this morning to have a look. All the cracks have been repaired and looks like a really good job. They are going to fully respray the fairings and have done an amazing job masking all the stickers and lettering.
A set of Bridgestone BT003's should be here Tuesday so by next weekend the bike will be ready for action. Almost 6 weeks since I bought the bike so getting quite excited to finally ride it.
Will update with pictures once I get home.

